Substrate preparation
Blinding cleaned and levelled, protrusions removed, corners filleted.
A single welded envelope below ground — walls, floor and soffit as one continuous skin, tested before it is buried.
A basement that leaks cannot be fixed cheaply. Once the structure is backfilled and in service, the water path is on the outside and every repair is made from the wrong side of the concrete.
Coated systems depend on the thickness a crew achieved on the day, and there is no way to prove it before the excavation is closed. That is the gap this system removes.
Prefabricated PVC sheet, lapped and hot-air welded into a continuous membrane that wraps the entire below-grade envelope. No cold joints, no thickness variation, and — the part that matters — every seam is testable before backfill.
Six stages, all photographed on the same job. Very few contractors anywhere can show the whole sequence from their own work.
Blinding cleaned and levelled, protrusions removed, corners filleted.
Panels positioned and lapped to the specified overlap, floor first.
Hot-air wedge welding, twin-track with a test channel between the welds.
Pipe penetrations, column bases, wall-to-floor junctions, day joints.
The envelope filled and held. The verification step, and the one nobody else photographs.
Protection layer, backfill, and the handover file with every weld test recorded.
Most enquiries are answered the same day. Send the problem with a photograph, or look through the services first.