Skip to content

Engineering & specialist works

Pioneers in specialist structural solutions.

AGIAL Engineering & Specialist Works — innovative structural and advanced geotechnical solutions that secure major projects and structures.

Numbered starting blocks along the deck of a covered competition pool
Ragab International SchoolsEducation
280+Projects delivered since 2016

Approved applicator for 13 international manufacturers

FosrocSikaMaster BuildersWeber · DRYMIXPenetronCMB · MarmoxSPORTECKRAIBURG RelastecKryptonNovochemQMCHEMTSAraco

The contractors who put us on their sites

Hassan Allam Construction
The Arab Contractors
Petrojet
Rowad Modern Engineering
Osman Group
CCC
EDGE Engineering Specialized Works
CRC Dorra
Pentagon Contracting & Trading
OSISCO
NPC
Kased Khair
Build Egypt
SafeLink for Contracting
Round Flooring
DeepTech
Orascom Construction
SIAC Construction
Redcon Construction
Talaat Moustafa Group
CSCEC
Elaraby
PREMCO
GIECO
Shield Specialized Construction
SCAS
CIS Group
Al Binaa Al Hadith Contracting
Troy Contracting & Trading
International Super Screed
KBH Solutions

Specialist focus

Three capabilities across a building's life

Alongside the full service range, these three are where AGIAL leads the market — and each is bought by a different person at a different moment.

  1. Before the structure

    Tripod percussion rig and well casings on a coastal site
    PhotographTripod percussion rig and well casings on a coastal site.

    Dewatering

    Deep-well systems

    Deep-well systems that take the water table down so excavation and foundations can proceed at all.

    Main contractor, at tender or on an emergency call

    View all
  2. As it goes up

    Section drawingSection — the membrane as one unbroken skin, with groundwater bearing on it from outside.

    PVC membrane tanking

    Welded below-grade envelope

    Welded sheet membrane forming a continuous below-grade envelope — walls, floor and soffit as one sealed skin.

    Contractor and consultant, specified at design stage

    View all
  3. Decades later

    Section drawingSection — laminate bonded to the beam soffit; its depth and the columns it frames into are untouched.

    CFRP strengthening

    Fosroc-certified

    Carbon fibre bonded to existing concrete to add capacity without demolition or added dead load.

    Structural consultant, on a standing building

    View all
280+Projects delivered
18Specialist services
2016Working since
13Manufacturer approvals
35Engineers & specialist crew

Selected work

280+ projects, across every sector

Industry, education, hospitality, healthcare, government and defence.

Acrylic court with a petrochemical plant on the horizon
Industrial

ETHYDCO

Cooling towers — cementitious repair, tank waterproofing, injection, anti-carbonation.

View all

All projects

Why AGIAL

More than one trade on the same site

Most specialist work fails at the junction between two subcontractors. AGIAL removes the junction.

  • Waterproofing, repair and flooring on one contract — one party answerable to you
  • The technical office prices from drawings, so the tender is not a guess
  • Method statements and QA records issued before work starts, not after
  • 35 engineers and technicians on our own payroll, not hired in per job
  • Alexandria-based, working nationwide, mobilised within the week
Two-man crew spraying liquid membrane across a large roof

Structural strengthening

CFRP strengthening

Fosroc-certified applicator

Carbon fibre plates and fabrics bonded to existing concrete to raise the capacity of a column, beam or slab — with no demolition and no added dead load. The building stays in use while the work goes on.

  • When the use changes or a floor is added and the existing members no longer carry the load
  • When a beam or slab cracks or sags, or reinforcement corrodes and loses section
  • When demolition and rebuild would close the building for months — this is done around it
  • Every step is workmanship: substrate prep, primer, saturant and the bond line — that is what decides it
More on CFRP strengthening

Three offices, one chain of responsibility

Technical office

Specifies the specialist works, assesses the structure, and writes the method before anyone mobilises.

Execution office

Runs the sites, sequences the trades, and holds the quality records that get handed over.

Directly-employed crews

35 engineers and specialist workers, trained on the systems they apply — not hired per job.

Send us the problem and a photograph.

Most enquiries are answered the same day. Send the problem with a photograph, or look through the services first.